Party wall agreements explained for Surrey homeowners

Lofts and extensions on terraced and semi detached houses often fall under the Party Wall etc. Act 1996. Here is when it applies, what notice you need to give and how the process works.

Short answer: if your project involves work to a wall you share with a neighbour, building on the boundary, or digging foundations close to a neighbour’s building, the Party Wall etc. Act 1996 is likely to apply. You must serve notice on the affected neighbours before work starts. Party wall matters are arranged by you as the homeowner, and we offer advice and support throughout.

When the Act applies

  • Work to a party wall, such as cutting in steel beams for a loft conversion, removing a chimney breast or raising the wall.
  • Building a new wall on the boundary line, for example a side return extension built up to the boundary.
  • Excavating near a neighbour’s building, generally within three metres and deeper than their foundations, or within six metres in some deeper cases.
Loft conversions on attached houses usually involve work to the party wall. Albert Road, Ashford
Loft conversions on attached houses usually involve work to the party wall. Albert Road, Ashford.

Serving notice

Notice must be served in writing before work starts. For work to a party wall, the notice period is two months. For new boundary walls and excavations, it is one month. Your neighbour can consent, or dissent and ask for a party wall surveyor. If they do not reply within 14 days, a dispute is treated as having arisen and surveyors are appointed.

Surveyors and the party wall award

Neighbours can agree to use one surveyor, or each appoint their own. The surveyors record the condition of the neighbour’s property, then agree a party wall award that sets out what work can be done, how and when, and how any damage would be put right. The homeowner carrying out the work normally pays the surveyors’ fees.

Talk to your neighbours early

A friendly conversation before the formal notice usually makes the process quicker and cheaper. Showing your neighbours the drawings and explaining the timetable helps them feel informed rather than surprised.

How we help

Party wall agreements are the one item our clients arrange themselves, but we make it straightforward. We identify early which walls and neighbours are affected, provide the drawings and structural details the surveyors need, and plan the programme around the notice periods. Learn more about our loft conversions and extensions.

Toilet ensuite, a Surrey Build Group project

Project Kick Start Meeting

Ready to talk about your project?

Book your Project Kick Start Meeting. We will talk through your plans, explain what is possible and follow up with a design and a fixed build price.

  • In house architects and structural engineers
  • Your build cost locked in when you appoint us
  • A dedicated site crew, project manager and project co-ordinator

Prefer to talk? Call 0203 603 9777 or email hello@surreybuild.co.uk.

Call us Kick Start Meeting